TORNESCH – THYSSENKRUPP
TORNESCH – THYSSENKRUPP
Construction of a modern logistics/production facility for thyssenkrupp Plastics GmbH in Tornesch. The site is conveniently located near the A23 motorway.
The property has been sold to LIP Invest GmbH.
Ende 2021
Projektabschluss
7.800
m²
Hallenfläche
20.000
m²
Grundstücksfläche
Project data & equipment
- Location: Tornesch (catchment area Hamburg)
- Hall height: 10.0 lower edge truss
- Floor load: 5.0 t/m²
- Heating: Gas dark radiators
- Loading: Lateral unloading incl. canopy, structural pre-equipment for low yards / rear tendering
- Access: 6 electrically operated sectional doors
- Fire protection: Fire alarm system, sprinkler system
- Lighting: LED
- Preinstallation: Static design for a PV system, 4 car e-charging stations, e-bike charging stations
DGNB Certificate in GOLD
The project was awarded the DGNB Gold certificate.