LUNEDEICH BREMERHAVEN
LUNEDEICH BREMERHAVEN
The assembly and storage hall at Lunedeich was taken over by Peper & Söhne at the beginning of 2015. The hall offers space for two tenants and includes assembly and storage areas as well as two separate, integrated office spaces.
Anfang 2016
Projektabschluss
10.000
m²
Grundstücksfläche
2.700
m²
Hallenfläche
Project data & equipment
- Location: Bremerhaven, Am Lunedeich
- Distance to city centre: approx. 7 km
- Road access: A27 / B71
- Hall height: 7.9 m lower edge of truss
- Loading: 4x gate at ground level
- Lighting: Halogen