LOGISTICS CENTRE LANGWEDEL
Logistics centre Langwedel
The state-of-the-art logistics centre, which was completed in 2023, is located on the A27 motorway in Langwedel (Lower Saxony). It is heated with an air heat pump and does not require gas.
50 per cent of the available space has been leased to WePackIt GmbH on a long-term basis.
The project is aiming for DGNB Platinum certification.
Mitte 2023
Projektabschluss
Über 17.900
m²
Hallenfläche
Über 38.000
m²
Grundstücksfläche
Project data & equipment
- Location: Langwedel Lower Saxony
- Road access: A27 junction
- Site area: approx. 38,400 m²
- Hall area: up to approx. 18,000 m²
- Office and social areas: up to approx. 1,200 m²
- Loading: 20 rear service gates, 2 sectional gates
- Ready for occupancy: Q3/2023
- Hall height: 10 m lower edge truss
- Floor load: 5 t/m²
- Heating: Air heat pump (without gas)
- Loading: Access via ramp or at ground level
- Access: Electrically operated sectional doors
- RWA integrated
- Lighting: LED / ESFR sprinkler system
- WGK3 sealing
DGNB Certificate
The DGNB (German Sustainable Building Council) Platinum certificate is being sought for the new building.