Labradorstrasse_1.png

BREMERHAVEN NORDCERAM

BREMERHAVEN NORDCERAM

New construction of an industrial and logistics hall for third-party use, including office and social areas. The project was carried out to an EG-55 standard and was realised for NordCeram, Teil der Steuler Fliesengruppe.

Mitte 2022
Projektabschluss
26.000
Grundstücksfläche
14.000
Hallenfläche

Project data & equipment

  • Location: Bremerhaven Bohmsiel (approx. 50 km to Cuxhaven / approx. 60 km to Bremen / approx. 70 km to Wilhelmshaven)
  • Distance to city centre: approx. 7 km
  • Road access: A27
  • Loading facilities: Low yard with two rear loading bays and ground-level hall gates
  • Lighting: LED
  • PV system on the roof
  • Pre-installation for e-charging points
  • Exterior exhibition area

DGNB Certificate in Gold

The project was awarded the DGNB Gold certificate.

 

DGNB_Zert_Geb_Gold.png