Luftaufnahme des Geländes "Lloyd Industriepark Bremen". Abgebildet werden verschiedene Gebäude und Lagerhallen. Das Gelände ist weitläufig, begrünt und mit verschiedenen Parkplätzen ausgestattet.

LLOYD INDUSTRIEPARK BREMEN

MODERN BUSINESS PARK

In 2014-2017, Peper & Söhne developed a brownfield in a central location in Bremen into a modern industrial park: the Lloyd Industriepark. The aim was to revitalize the historic site and develop it into a functioning hub in Bremen's Neustadt or Airport City.

 

As part of the project development, the 130,000 m² area close to the city center and the airport was completely revitalized. The existing buildings from the 1940s and 1950s were modernized to preserve the historic character of the area.  Moreover, the area was enhanced by the addition of further modern commercial buildings. 

 

Peper & Söhne attached great importance to a uniform and appealing overall appearance, which included a comprehensive high-quality equipment of new buildings and existing buildings as well as an attractive design of the outside areas.  The historic head building and the seven halls offer approx. 48,000 m² of hall space and approx. 9,200 m² of office space.

 

Thanks to an attractive mix of sectors and direct access to the A 281 freeway, the B75 trunk road and local public transport, the site was quickly revitalized and established.

Lloyd Industriepark has been owned by BEOS AG since 2018.

2018
Project completion
130,000
Property area

PROJECT DATA & EQUIPMENT

  • Location: Airport city Bremen
  • Property area: approx. 130,000 m²
  • Hall area: approx. 48,000 m²
  • Office space: approx. 9,000 m²
  • Distance to city center:
    approx. 3 km
  • Top connections:
    A 281 / B 75 / public transport /
    airport / city center
  • Attractive mix of industries
  • High-quality and modern equipment

Halls

The hall complex consists of 2 separate logistics buildings (storage areas). These are connected to each other via the head building (office space on 2 floors).

Equipment:

  • Hall height: UKB up to 9 m
  • Floor load capacity: up to 5 t/m²
  • Loading: gates available at ground level
  • Lighting: LED, halogen
  • Fire protection: Sprinkler
  • Miscellaneous: Ceiling heating

Project completion: End of 2016  

Hall area: 13.460 m² 

Office space: 3.490 m² 

New construction of a third-use logistics hall with integrated office mezzanine for the tenant STUTE Logistics (AG & Co.) KG. Spare parts for the Airbus military transporter A400 M are stored in the hall, which was handed over on time on July 01, 2016.

Equipment:

  • Hall height: UKB 10.15 m
  • Floor load capacity: 7 t/m²
  • Loading: 2x gate at ground level, 7x rear unloading, 3x side unloading
  • Lighting: LED
  • Fire protection: Sprinkler

Project completion: Mid 2016  

Hall area: 20.530 m² 

Office space: 10.000 m² 

The hall complex consists of storage and logistics areas as well as a two-storied office space.

Equipment:

  • Hall height: UKB between 6-9 m
  • Floor load capacity: up to 5 t/m²
  • Loading: gates at ground level and rear dock gates available
  • Lighting: LED, halogen
  • Fire protection: Sprinkler
  • Miscellaneous: ceiling heating

Project completion: End of 2016  

Hall area: 13.430 m2 

Office space: 2.880 m2 

New construction of a third-use warehouse with adjoining office wing for the tenant WeGo Systembaustoffe GmbH.

Equipment:

  • Hall height: UKB 8 m
  • Floor load capacity: 5 t/m²
  • Loading: 4x door at ground level
  • Lighting: LED
  • Fire protection: Sprinkler

Project completion: Beginning 2017

Hall area: 14.500 m² 

Office space: 4.050 m² 

New construction of a third-use warehouse with integrated office space for the tenant  W. & L. JORDAN GmbH.

Equipment:

  • Hall height: UKB 8 m
  • Floor load capacity: 5 t/m²
  • Loading: 1x gate at ground level, 4x rear discharge
  • Lighting: LED
  • Fire protection: Sprinkler

Project completion: Mid 2017  

Hall area: 5.100 m²

Office space: 1.070 m² 

New construction of a third-use warehouse and assembly hall with integrated office for the tenants CWS-boco GmbH and Dowaldwerke GmbH.

Equipment:

  • Hall height: UKB 8 m
  • Floor load capacity: 5 t/m²
  • Loading: 7x gate at ground level, 9x rear discharge
  • Lighting: LED
  • Fire protection: Sprinkler

Project completion: Beginning 2017

Hall area: 18.550 m²

Office space: 5.800 m²

New construction of a 4-storey modern office building with adjacent production facility for Airbus DS Airborne Solutions GmbH. The building was sold to DIC Asset AG.

Equipment:

  • Hall height: UKB 8 m
  • Modern passenger lift
  • Comprehensive safety concept
  • Lighting: LED
  • innovative and creative workplaces

Project completion: 2020  

Hall area: 17.000 m² 

Office space: 9.000 m² 

Discover more

  • Foto des Bürogebäudes "ADAS". Dargestellt ist ein großes, dunkles Gebäude mit schmalen, bodentiefen Fenstern und einer durchgehenden Fensterfront auf einer Seite. Vor dem Gebäude befindet sich eine Zufahrt zu Parkplätzen.

  • Luftaufnahme des Geländes "Lloyd Industriepark Bremen". Abgebildet werden verschiedene Gebäude und Lagerhallen. Das Gelände ist weitläufig, begrünt und mit verschiedenen Parkplätzen ausgestattet.

  • Foto einer Lagerhalle. Abgebildet ist eine sehr lange Lagerhalle mit dunkler Fensterfront und Verladestationen für LKW.

  • Foto einer großen Güterhalle. Abgebildet ist eine große, dunkle Güterhalle, vor der verschiedene LKWs an den Ladeklappen stehen.

  • Foto einer großen Halle mit der Aufschrift "JOKA". Dargestellt ist eine große, dunkle Halle mit einer verglasten Eckfront und einer Ladeluke für LKW. Oben unter dem Dach steht "JOKA, Paket, Teppich, Designböden, Tapeten, Wohnstoffe".

  • Foto eines Bürogebäudes aus Backstein. Es handelt sich um ein langgestrecktes Gebäude mit überdachten Eingängen aus Backstein.

  • Foto der Halle 6 mit angrenzendem Bürogebäude. Abgebildet ist eine große Halle mit der Aufschrift "Halle. 6", davor ein kleineres weißes Gebäude, das als Bürogebäude dient.

  • Foto der Halle 8: Dargestellt ist eine große Lagerhalle mit vier Ladeluken für LKW und zwei Laderampen. Oben ist die Aufschrift "Halle 8" zu sehen.

  • Photo of the "ADAS" office building. It shows a large, dark building with narrow, floor-to-ceiling windows and a continuous window front on one side. There is an access road to the car park in front of the building.

  • Aerial view of the "Lloyd Industriepark Bremen" site. The picture was taken with a drone over a motorway junction and shows various buildings and warehouses. The site is spacious, green and equipped with various car parks.

  • Photo of a warehouse. Pictured is a very long warehouse with a dark window front and loading stations for lorries.

  • Photo of a large goods shed. The picture shows a large, dark goods hall with various lorries standing in front of the loading flaps.

  • Photo of a large hall labelled "JOKA". It shows a large, dark hall with a glazed corner front and a loading hatch for lorries. At the top under the roof it says "JOKA, parcel, carpet, designer flooring, wallpaper, living fabrics".

  • Photo of a brick office building. It is an elongated building with covered brick entrances.

  • Photo of Hall 6 with neighbouring office building. The photo shows a large hall labelled "Halle. 6", in front of it a smaller white building that serves as an office building.

  • Photo of Hall 8: This shows a large warehouse with four loading hatches for lorries and two loading ramps. The inscription "Hall 8" can be seen at the top.